Liebherr
Oberopfingen
Production halls
We constructed three production halls with 33,500 sqm of floorspace and nine structural installations. One hall was built as a reinforced precast concrete construction with a second production level and other auxiliary buildings. For the other two steel halls we built the foundation, a 181 m long and 15.80 m high complex partition, and 600 lineal metres of sandwich base walls, as well as two administrative buildings with a length of 132 m and five floors.
Gallery
More References